PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished installing metal decking at Derricks 4-6 (4th Floor) Facing South-West  (800x600).jpg Started laying out gravel for the slab on grade at the Servery Room 105 Facing North-East   (800x600).jpg Material for Stairs -2 Facing South (800x600).jpg Started installing the trench drains at Rooms 141,142,145 Facing West (800x600).jpg
Previous pageNext page Material for Stairs -2 Facing South (800x600)
Material for Stairs -2 Facing South (800x600)